VLC
and Chapel School Building Project
If you have
a media viewer, you can see and hear the Village Lutheran Church
right from your own computer, just by clicking on the links below.
(You can download the following players for free: click on the
icons below.)

http://www.real.com/realone

http://www.microsoft.com/windows/windowsmedia/download/default.asp

http://www.apple.com/quicktime/download
Watch construction
(from the bell tower)
Choose connection
speed:
28.8-56k (starts sooner)
T1. DSL. cable (smoother)
Watch demolition
(from the parking lot by the bell tower)
Choose connection
speed:
28.8-56k (starts sooner)
T1. DSL. cable (smoother)
The
building is dedicated! Watch us grow!

Texas
sized scissors for the ribbon cutting

The
start of a new era of ministry

Look
how far we have come by God's grace!

The
South Side of the education wing

The
walls are closing in!

A
new pre-school room, complete with bathroom!

East
Side Stairway

The
Brickwork creeps up the North Wall.

The
North Side walls take shape.

Pastor
Rob Hartwell, Principal Jim Dhyne and school parent and parishioner
Mark Blanco take a look around.

The
new lobby off the Great Porch

The
gymnasium comes together!

The
new library sans books
For
More Pictures Go to the Building Project Picture Gallery
Building
a Family of Faith Campaign-Imagine
Imagine coming
to a church dinner and having room in a spacious fellowship hall
in the undercroft of the church with an expanded and fully functioning
kitchen where the meal can be prepared plus a stage for entertainment.
Imagine
socializing during coffee hour after church in a completely refurbished
Friendship Room. Imagine thirteen flexible, computer-networked
classrooms meeting the needs of our Sunday school children and
Chapel School students.
Imagine
an elegant Church/School reception area that befits our sanctuary
– an entrance way that engages a visitor and communicates the
pride we have in our Church and School. Imagine the community
outreach that can be accomplished with a multipurpose gymnasium,
fellowship hall, refurbished Friendship Room, and all the available
classrooms.
It is now
our opportunity to make a difference. The completion date will
be scheduled for Fall 2002.
Everyone
will be called in the near future to participate in this campaign.
If you will like to respond before that call, contact Jim Dhyne
at (914) 337-3202.
God
has great plans in store for us. Imagine!